以下是网学网为您推荐的轻化工程-日产150吨涂布白板纸干燥部、涂布及完成整理部工艺设计,希望本篇文章对您学习有所帮助。
论文编号:QH020 论文字数:18638,页数:40 附CAD图
年产5万吨涂布白板纸制浆造纸综合工厂设计
重点:日产150吨涂布白板纸干燥部、涂布及完成整理部工艺设计
摘 要:本设计的题目为年生产5万吨涂布白纸板制浆造纸综合工厂,重点为日产150吨涂布白板纸干燥部、涂布及完成整理部工艺设计。本设计追求绿色为前提,积极履行国家环保要求,以废纸为主要原料,经过碎解、脱墨等工序抄造涂布白纸板,用电全来自10万千瓦自备热电站,造纸设备采用日产150吨的四叠网纸机,设计内容包括浆水平衡计算图绘制、设备选型及计算、车间设备平面布置图、工艺流程图绘制,人员的技能条件要求,原料的分类管理,运输管理设计,厂区绿化布局,给水排水规划,污染物的净化和排放,环境保护和综合利用。
关键词:制浆造纸;涂布白纸板;造纸车间;干燥
Annual 5 ten thousand tons of coating whitepaperboard pulp integrated plant design
Key: 150 tons of coating, coating, dry white paper and arrangement of process design
ABSTRACT:The design of the topic for produced 50,000 tons of coated paper pulp and paper board, comprehensive factory for 60 tons daily of pulp production Premised on the pursuit of green, the positive performance of the State Environmental Protection requirements, after a broken solution, deinking processes Coated Paperboard building to copy.line core process design:The design is divided into four parts. The first part includes the following : engineering background, the need and demand for engineering and design size; The second part comprises the following elements : overall project design conditions and horizontal layout; The third part consists of the following : the composition of the entire plant production workshop and workshop production of integrated narrative; The forth part consists of the following elements : plant construction and structure, water supply and drainage, power, robotic instruments and resources as well as environmental protection and labor safety and health.
KEY WORDS: Pulp and papermaking; coated paper board; workshop; dry
目 录
摘要……………………………………………………………………………………I
ABSTRACT…………………………………………………………………………… II
目录…………………………………………………………………………………III
1 工程设计背景与发展状况…………………………………………………………1
1.1 工程设计的背景………………………………………………………………1
1.2 工程设计的必要性……………………………………………………………4
1.3 工程设计的发展状况…………………………………………………………5
1.4 需求预测与设计规模…………………………………………………………6
1.4.1 市场需求预测…………………………………………………………6
1.4.2 设计规模………………………………………………………………6
2 工程设计条件与总平面布置………………………………………………………6
2.1工程设计条件…………………………………………………………………6
2.2 总平面布置……………………………………………………………………7
3 生产工艺设计………………………………………………………………………9
3.1 全厂生产车间组成…………………………………………………………9
3.2 车间生产综合叙述……………………………………………………… 10
3.3 车间技术经济指标和工艺参数…………………………………………11
3.4 浆水平衡计算……………………………………………………………13
3.5 设备选型说明……………………………………………………………17
4 车间公用工程……………………………………………………………………22
4.1 厂房建筑与结构:…………………………………………………………22
4.2 给水与排水…………………………………………………………………23
4.3 动力…………………………………………………………………………25
4.4 自控与仪表…………………………………………………………………26
4.5 环境保护与综合利用………………………………………………………26
4.6 劳动安全卫生………………………………………………………………27
5 工程经济分析……………………………………………………………………29
5.1车间人员编制………………………………………………………………29
5.2车间成本估计………………………………………………………………30
6 小结………………………………………………………………………………32
致谢…………………………………………………………………………………33